LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
FUTURE SEWER CONSTRUCTION PROJECTS
La Cienega Interceptor Relocation Project: Jefferson to La Cienega 
The Secondary Sewer Renewal Program (SSRP)
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS
HELP PROTECT THE ENVIRONMENT

 
SOUTH MAP
Click map to view large.
CLICK TO VIEW LARGE
Project Information from the Bureau of Engineering

City Sewers Future Construction

Marina Freeway and Westchester Parkway Sewer Rehabilitation Project

This sewer pipe rehabilitation project began in late 2011 in West Los Angeles in an area bounded by National Blvd. to the north, Westchester Pkwy. to the south, Sepulveda Blvd. to the east, and Lincoln Blvd. to the west.


QUICK FACTS

  • About 4.1 miles of small diameter sewer pipe (6 to 10-inches) will be rehabilitated, or removed and replaced.
  • Construction period: late 2011 to fall 2012. Weather or other circumstances could shift the work schedule.  Neighbors will be informed as conditions warrant.
  • Construction will generally take place Monday through Friday, from 7:00 a.m. until 4:00 p.m., and on major streets from 9:00 a.m. until 3:30 p.m. to minimize traffic impacts.
  • Estimated Cost: $1,483,780
  • Construction methods include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption on your street, most of the construction work at each location will be completed in about 5-10 business days.n
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
  • Flaggers will be used where traffic is impacted.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
  • Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.

 

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,
or email bpw.pao@lacity.org
City of Los AngelesDepartment of Public Works
COPYRIGHT
AND DISCLAIMER
 BUREAU OF SANITATION
 BUREAU OF ENGINEERING
 CONTRACT ADMINISTRATION