La Cienega Interceptor Relocation Project: Jefferson to La Cienega 
Venice Pumping Plant Discharge Manifold Replacement Project
The Secondary Sewer Renewal Program (SSRP)
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS

 
Project Information from the Bureau of Engineering

City Sewers Future Construction

Bundy and San Vicente Sewer Rehabilitation Project

This sewer pipe rehabilitation project will begin in fall 2012 in the Brentwood area. The approximate project boundaries are Homewood Rd. on the north, Bundy Dr. on the south, Mandeville Canyon Rd. on the west, and Bringham Ave. on the east.


QUICK FACTS

  • About 1.83 miles of sewer pipes ranging from 8-inch to 12-inch in diameter will be rehabilitated or removed and replaced.
  • Construction period: summer 2012 through fall 2013. Weather or other circumstances could shift the work schedule. Neighbors will be informed as conditions warrant.
  • Construction within the City of Los Angeles will generally take place Monday through Friday, from 7:00 a.m. until 4:00 p.m., and on major streets from 9:00 a.m. until 3:30 p.m. to minimize traffic impacts.
  • Construction Cost: $757,900
  • Construction methods include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption on your street, most of the construction work at each location will be completed in about 5-10 business days.
  • Streets will be temporarily paved during sewer construction. Final paving will be placed when the project is completed.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
  • Flaggers will be used where traffic is impacted.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
  • Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,
or email bpw.pao@lacity.org