  4th Avenue and Slauson Avenue Sewer Rehabilitation Project
  Central Outfall Sewer at 59th Street and 4th Avenue Sewer and Storm Drain Reconstruction Project
  Figueroa Meridian York Sewer Project
The Secondary Sewer Renewal Program (SSRP)
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS
HELP PROTECT THE ENVIRONMENT

 
Project Information from the Bureau of Engineering

City Sewers Current Construction

Mulholland Drive and Bellagio Road Sewer Rehabilitation Project

This sewer pipe rehabilitation project began in spring 2011 in West Los Angeles. The approximate boundary of the project is Mulholland Dr. to north, Sunset Blvd. to the south, Roscomare Rd. to the east, and Mandeville Canyon Rd. to the west.


QUICK FACTS

  • About 2.3 miles of 6, 8, 12, and 15-inch sewer pipe will be rehabilitated, or removed and replaced.
  • Construction period: spring 2011 through summer 2012. Weather or other circumstances could shift the work schedule. Neighbors will be informed as conditions warrant.
  • Construction will generally take place Monday through Friday, from 7:00 a.m. until 4:00 p.m., and on major streets from 9:00 a.m. until 3:30 p.m. to minimize traffic impacts.
  • Estimated Cost: $1.52 million.
  • Construction methods will include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption in the streets, most of the construction work at each location will be completed in about 5-10 business days.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
  • Flaggers will be used where traffic is impacted. Traffic will be restored to normal when construction has been completed at the end of each workday.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
  • Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.

 

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,
or email bpw.pao@lacity.org