City Sewers Current Construction
Mandeville Canyon Road and Westridge Road Sewer Rehabilitation Project
Sewer pipe rehabilitation work begin in early 2008. The project is located in Brentwood and Pacific Palisades. The approximate boundary of the project is Cordelia on the north, Rockingham Avenue on the east, Reseda Boulevard on the west, and Napoli Drive on the south..
QUICK FACTS
- About 3.8 miles of sewer pipes ranging from 8 inches to 10 inches in diameter will be rehabilitated or removed and replaced.
- 10 new maintenance holes will be installed, and 3 existing maintenance holes will be upgraded.
- Construction period: early 2008 through spring 2009.
- Construction will generally take place Monday through Friday, from 7:00 a.m. until 5:00 p.m.
- Estimated Cost: $2,000,000.
- Construction methods will include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
- In order to minimize disruption on your street, most of the construction work at each location will be completed in about 5-10 business days.
- Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
- Dust control will be provided in all project areas.
- Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
- Flaggers will be used where traffic is impacted. Traffic will be restored to normal when construction has been completed at the end of each workday.
- Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
- Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
- You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.
|