LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
  Central Outfall Sewer Rehabilitation Project
   Newsletter
  Figueroa Meridian York Sewer Project
MAZE 5 Sewer Rehabilitation Project
  Odor Control – Rodeo Road and La Cienega Boulevard
Upper Beachwood East Maintenance Hole Addition Project
  Upper Beachwood West Maintenance Hole Project
The Secondary Sewer Renewal Program (SSRP)
3rd Street and La Cienega Boulevard Sewer Project
Avenue 43 and Marmion Way Sewer Rehabilitation Project
Avenue 50 and Monte Vista Street Sewer Project
Bellagio Road and Wilshire Boulevard Sewer Rehabilitation Project
Billowvista Dr and 83rd St Sewer Rehabilitation Project
Caesar Chavez Avenue and Alameda Street Sewer Project
Camden Avenue and Exposition Blvd Sewer Project
Eagle Rock Boulevard and York Boulevard Sewer Project
Emerson Avenue and 82nd Street Sewer Rehabilitation Project
Franklin Avenue and Hyperion Avenue Sewer Project
Fresno Street and Oregon Street Sewer Replacement Project
  Glendale Boulevard and Scott Avenue Sewer Project
Griffith Park Boulevard and Glendale Boulevard Sewer Project
Hesby Street and Riverton Avenue Sewer Rehabilitation Project
Hoover Street and Clarissa Ave Sewer Rehabilitation Project
Los Feliz Boulevard and Riverside Drive Sewer Project
Manzanita Street and Effie Street Sewer Rehabilitation Project
Mulholland Drive and Bellagio Road Sewer Rehabilitation Project
North Bundy Drive and Travis Street Sewer Rehabilitation Project
Ohio Avenue and Stoner Avenue Sewer Rehabilitation Project
Pasadena Freeway and Marmion Way Sewer Project
  Paseo del Mar and Carolina Street Sewer Rehabilitation Project
  Prosser Avenue and Olympic Boulevard Sewer Rehabilitation Project
Rodeo Road and Norton Avenue Sewer Project
Sanborn Avenue and Griffith Park Boulevard Sewer Project
Sunset Boulevard and Glen Rising Drive Sewer Project
Ventura Boulevard and Lankershim Boulevard Sewer Rehabilitation Project
Verdugo Road and Avenue 33 Sewer Project
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS
HELP PROTECT THE ENVIRONMENT

 
Project Information from the Bureau of Engineering

City Sewers Current Construction

Griffith Park Boulevard and Glendale Boulevard Sewer Project

This sewer pipe rehabilitation project began in early 2010 in Hollywood and the Silver Lake – Echo Park areas. The approximate boundary of the project is Rowena Ave. on the north, Sanborn Ave. on the west, Glendale Blvd. on the east, and Landa St. on the south.


QUICK FACTS

  • About 1.4 miles of 6,8,12, and 15-inch sewer pipe will be rehabilitated, or removed and replaced.
  • Construction period: early 2010 through fall 2011. Weather or other circumstances could shift the work schedule. Neighbors will be informed as conditions warrant.
  • Construction will generally take place Monday through Friday, from 7:00 a.m. until 4:00 p.m., and on major streets from 9:00 a.m. until 3:30 p.m. to minimize traffic impacts.
  • Estimated Cost: $907,000.
  • Construction methods will include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption in the streets, most of the construction work at each location will be completed in about 5-10 business days.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
  • Flaggers will be used where traffic is impacted. Traffic will be restored to normal when construction has been completed at the end of each workday.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
  • Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,