 |
Odor Advisory Committee
Documents
ACROBAT
Acrobat files listed on this page require Adobe Acrobat Reader which may be downloaded HERE |
 |
Work begins in the residential neighborhood along Buckingham Ave. |
 |
Workers excavate a jacking pit. The tunnel will be dug from the bottom of the pit and sewer pipe will be placed in the tunnel. |

|
A pipe segment is lowered into the jacking pit. |
|